Our Plumbing Projects

Our Work

Recent Plumbing Projects in the Las Vegas Valley

Every project below was completed by our crew. Open a project to see the challenges, the solution and the full photo set.

A new mechanical room with twin wall-hung boilers, radiant manifolds and a dedicated gas supply.

Project Location:

Summerlin

Property Type:

Custom Home

System Type:

Wall-Hung Boilers & Radiant

Completion Time:

March 2026

Burner service, controls check and a broken floor drain line rebuilt for a busy commercial building.

Project Location:

North Las Vegas

Property Type:

Warehouse & Offices

System Type:

Boiler Burner & PVC Drain

Completion Time:

January 2026

An outdated boiler room stripped and rebuilt with cascaded high-efficiency boilers and indirect storage.

Project Location:

Henderson

Property Type:

Apartment Building

System Type:

Cascade Boilers & Storage

Completion Time:

February 2026

A leaking 12-year-old tank replaced the same day with new venting, gas connector and expansion tank.

Project Location:

Spring Valley

Property Type:

Single-Family Home

System Type:

50-Gallon Gas Water Heater

Completion Time:

April 2026

A space-saving wall-mounted electric water heater installed on a bracket with new copper connections.

Project Location:

Paradise

Property Type:

Condominium

System Type:

Wall-Mounted Electric Heater

Completion Time:

May 2026

New copper risers, isolation valves and a large expansion tank for a mixed-use building downtown.

Project Location:

Downtown Las Vegas

Property Type:

Office & Retail

System Type:

Copper Risers & Expansion Tank

Completion Time:

June 2026

Annual testing for every assembly on site, with two failed devices rebuilt and retested the same day.

Project Location:

Enterprise

Property Type:

Retail Center

System Type:

RPZ & Double Check Assemblies

Completion Time:

July 2026

A high-efficiency boiler and indirect tank piped on a clean backboard with a hydraulic separator.

Project Location:

Green Valley

Property Type:

Single-Family Home

System Type:

Combi Boiler & Indirect Tank

Completion Time:

August 2026

A failed outdoor water heater replaced with an outdoor-rated unit and protected supply lines.

Project Location:

Sunrise Manor

Property Type:

Single-Family Home

System Type:

Outdoor-Rated Tank Heater

Completion Time:

August 2026

A large hot water cylinder with an expansion vessel, safety valves and a neat copper manifold, installed in a narrow closet.

Project Location:

Southern Highlands

Property Type:

Custom Home

System Type:

Unvented Cylinder & Controls

Completion Time:

September 2026

Contact Us Today!

Need a Plumber in Las Vegas Today?

Leaks, clogs, no hot water or a failed backflow test: tell us what is happening and we will get a licensed plumber to you quickly.

Quick Scheduling & Clear Communication

Call (702) 555-0148, answered 24/7.

Boiler and circulator pumps serviced by Desert Peak Plumbing Solutions